NSW Ports and its contractors implemented an environmental monitoring program for the development of the Enfield Intermodal Logistics Centre, which included real time dust and noise monitoring during construction.
Other environmental management measures during site preparation included traffic, soil, water, frog protection, heritage protection and waste management.
Because of this work, the project is producing some major environmental benefits. These include:
- Remediation of contaminated areas within the site.
- The creation of a Green and Golden Bell Frog habitat.
- The creation of a precinct at the southern end of the site, including a walkway, viewing areas, and heritage elements.
When fully operational, Enfield ILC will remove up to six million truck kilometres from Sydney’s roads a year, reducing annual CO2 emissions by approximately 1,000 tonnes.
Learn More